Sunologi Inc. (CBC1261200) builds and permits every room addition in Orange County under one contract. Lot coverage and setback rules decide what can be added far more than budget does on a small Orlando lot, so we start with the survey. Lakefront lots add shoreline protection setbacks, and an addition in a deed restricted subdivision needs HOA approval before the county will see it.
Permits
An addition needs signed and sealed drawings, a survey showing setbacks, and footing, framing, insulation and final inspections.
Before we start in Orange County
Horizon West and Lake Nona HOAs frequently require that an addition match the original elevation exactly, down to the stucco texture and roof pitch, so we design from the builder's plans when we can get them.
How the job usually runs
The additions we build most often in Orange County are primary suites off the back of a ranch house, in law suites with their own entry for a parent, and garage conversions in subdivisions where the HOA allows them. Florida rooms that were added without permits decades ago are also common, and bringing one up to code or replacing it is often the right first step. The tie in between the old roof and the new one is where additions leak, so we detail that connection on the drawings, not on site.
About 30 minutes down I-4 or SR 417.
Room Additions in Orange County: common questions
Who issues the permit for a room addition in Orange County?
The Orange County Division of Building Safety in downtown Orlando, unless the address is inside a city with its own department.
Request a Free Estimate
Tell us about your project and someone from our Sanford office will call you back, usually the same business day. Or call us now at 407-890-0442.
Talk to a licensed contractor, not a call center
Call our Sanford office at 407-890-0442 or send the estimate form. Site visits and written estimates are free, and the license number on your paperwork will match the one in our footer: CBC1261200.
Call 407-890-0442